Complete Bracing Necessary To Erect A
Straight, Plumb, And Square
Perma-Form Structure.
Three Men, 465 Perma-Form Blocks,
26 Cubic Yards Of Concrete, Created This
10 Foot High Structure On A
Prepared Concrete Slab In Two Days.
The Forms Were Pumped With 3000 PSI
Pump Mix Concrete By A 2 1/2 Inch
Line Pump In Two Continuous Lifts
Without Form Blowouts Or Other Problems.
Perma-Form
1-800-318-1750 |